fbpx
Navigation

Bill Wallis Wing: Update 19th December 2015

19th December 2015

The roof of the Bill Wallis Wing is coming together nicely now, with the supporting brickwork almost complete and the lining being put on. From the pictures you can now make out where the roof will come down from the top floor alongside the John Thornley Suite, and you can see just how close the builders are to knocking through the existing brickwork. Also within the pictures is something representing a mud-bath – a sight more commonly seen at a trial, not Kimber House!